Daniel Boone Elementary School

Warrenton, Missouri

Client: AK Rentals
Location: Warrenton, MO
Project Duration: January 2026 – March 2026

Project Manager: Wally Terry

Scope & Systems

  • Surface & System Type: Above-grade continuous air barrier system
  • AVM Systems Used:
    • AVM Aussie Membrane 500

Construction Process Overview

  • The Daniel Boone Elementary School project required a continuous air barrier system that could be installed efficiently while maintaining quality across the building envelope. Although the project was originally specified with Barritech NP, the contractor elected to switch to AVM Aussie Membrane 500 due to strong confidence in the product and the value of reliable local rep support.

  • Maintaining productivity and keeping crews moving was a key priority. Proper air barrier application requires consistency and control, and AVM’s support helped ensure the crew had the guidance needed for smooth execution. The installation performed extremely well, with the crew noting excellent spray characteristics, clean application, and strong hang on vertical surfaces.

Challenges & Solutions

  • Challenge: Maintaining installation speed while ensuring consistent application quality across the full building envelope.

  • Solution: AVM Aussie Membrane 500 delivered smooth sprayability, excellent vertical hang, and clean coverage. Combined with strong local technical support, the crew was able to install efficiently and confidently without slowing production.

Results

  • Smooth, consistent installation with strong vertical hang performance
  • Crews maintained productivity and steady workflow
  • Clean application helped improve envelope consistency
  • Reduced risk and uncertainty through responsive local support
  • Efficient schedule supported by fast, reliable application

Design Integration

  • Design goal: Provide a continuous air barrier system to support longterm building envelope performance while maintaining efficient construction sequencing.

  • The project was originally specified with Barritech NP, but AVM Aussie Membrane 500 was selected due to strong contractor confidence in product performance and dependable local technical support. The system allowed for clean, consistent application across the building envelope while supporting quality installation without slowing production.

System Selections & Benefits

System Purpose Design Benefit
AVM Aussie Membrane 500 Fluid-Applied Air Barrier Smooth spray application with excellent hang on vertical surfaces, supporting continuous envelope performance

Technical Collaboration

  • AVM provided responsive local support throughout the project, assisting with product selection, coordination, and installation guidance. This ensured consistent application quality and minimized uncertainty for the field crew.

Outcome

  • Continuous air barrier installed cleanly and efficiently
  • Strong consistency across the building envelope
  • Improved productivity through smooth spray and vertical hang performance
  • Reduced risk through local technical support and installation guidance

Project Objective

Provide a continuous air barrier system that supports long-term building performance while keeping installation efficient and the project moving on schedule.

Owner Goals

  • Ensure reliable building envelope performance
  • Maintain steady construction progress without delays
  • Reduce installation risk through proven systems and support
  • Deliver consistent air barrier application across the entire building

Key Challenges

  • Maintaining productivity while ensuring quality installation
  • Balancing speed with proper application consistency
  • Avoiding uncertainty tied to product selection and field execution

AVM Solutions Delivered

  • AVM Aussie Membrane 500 was selected in place of the originally specified Barritech NP. The switch was driven by the contractor’s confidence in AVM’s local support, responsiveness, and service—providing an added layer of assurance during installation.

Value Delivered

  • Confidence & Support: Strong local rep involvement and technical guidance
  • Risk Reduction: Reduced uncertainty through responsive field coordination
  • Productivity: Smooth spray application allowed crews to maintain pace
  • Quality Consistency: Clean and uniform installation across the envelope
  • Schedule Efficiency: Faster workflow supported an efficient project timeline
Aussie Membrane 500 below-grade waterproofing in progress on commercial foundation wall
Aussie Membrane 500 below-grade waterproofing in progress on commercial foundation wall
Aussie Membrane 500 spray application equipment and materials staged for below-grade waterproofing installation
Aussie Membrane 500 below-grade waterproofing in progress on commercial foundation wall

Sign-up For Our Newsletter

Get the latest news, product information and up-to-date industry information.

Please fill in your full name

This field is required

Your email address will never be used for evil

This field is required

This field is required

You may unsubscribe at any time.